when its done, that sounds familiar, my Scimitar is a bit like that my eldest lad had a couple of mates round the other day, well the engine and gear box are in it'll be on the road in six months wont it?
I don't have a time scale for it just when every thing is 101% it will be done,
i'm not doing it the easy way and dropping in the engine and connecting it to the standard loom, that was shit when they built it in 69 I'm using the entire Omega loom cut the fuel pump mount form the plastick tank an am letting it into the stainless one I have. Have you ever seen an Omega loom out of the car, bloody huge my workshops 7.5 mtrs long its hanging down both sides with loops in it !!
the Omega is being stripped of every thing I can use. ease of maintenance in the future its going to be used every day.