Omega Owners Forum
Chat Area => General Discussion Area => Topic started by: Craig_R on 24 October 2007, 14:00:54
-
http://www.go-lpg.co.uk/Omega_V6.html
-
http://www.go-lpg.co.uk/Omega_V6.html
I asked for that to be taken >:( >:( down hence I always mention
Took 7 days to do it, rather than 5 - couldn't get hot water.
Loom ran along side EGR valve, melted loom killed DIS pack, when on green wire before it caused major running problems.
ECU in airbox throttled the engine
Kept dropping to petrol all the time
All in all the car was off the road for 3 weeks including the DIS problems and me not being able to change it.
Better to do it yourself rather than risk it.
Not happy with that at all hence the email arguments after I got the kit back.
I wonder why the current install is so much less hassle!!!!