I was going to post on this when I got on this evening. Just come back from Scarborough. 30 years ago I could do the journey in 2 hours and 30 minutes. best ever was 2.20.Today- admittedly a bank holiday took 4 hours 30 of driving. First 30 miles took over 90 minutes.
Smart motorways? Well I saw the M1 from leicester to Sheffield.50mph and a zillion yellow average speed cameras. Some cars must have had cloaking devices because they belted past. Any work happening? NO. Five days ago, any work happening? Well we saw two men with clipboards.
Some questions. Is that pink electric cable conduit the finished product? It is fastened to the top of the central concrete armco for mile after mile occasioanlly going up and over a bridge or near Sheffield on the floor held in place by a sandbag every couple of yards. My question is if that is the finished product what happens when there is a bad smash and something skims the top of the central reservation for a few hundred metres.? Why didn't they just bury it once?
Second question. This is based on my experience of Smart things like TVs. What happens when the system buffers or hangs or worse needs a restart? Does everyone have to stop and wait?
Observation about Uk driving. What a load of prats most drivers are. Very poor anticipation, rubbish at merging at end of a dual carriageway. I guess they are too busy texting or checking sat nav is sending them home.