Audi Quality

Started by Broomies Mate, 02 June 2015, 02:34:32

Previous topic - Next topic

0 Members and 0 Guests are viewing this topic.

mka306

Quote from: STMO on 03 June 2015, 19:31:39
Quote from: mka306 on 03 June 2015, 07:20:31
When I first spotted the Volvo my first thought was it's a second hand dealers until I realised it was a main dealer so assumed it was there second hand lot, plus I did wonder why they had the vehicles stored on the top floor, not a great idea even if its designed for it.
Multi-storey car parks seem to get away with it.

Good point, but the entire structure of a multi-story car park is solid front top to bottom and all sides whereas the Audi dealer looks like a big tin hut ;D ;D

Mr Gav

I would assume that it was designed for it, hard to believe they`d get the cars up there if it wasn`t  :D

I bet the structural engineer has got some explaining to do  :o

05omegav6

The architect behind the newish carpark at Gatwick North Terminal must be struggling to sleep too... Been open barely five years and already been condemned ::)

mka306

Quote from: Taxi Al on 03 June 2015, 23:28:39
The architect behind the newish carpark at Gatwick North Terminal must be struggling to sleep too... Been open barely five years and already been condemned ::)

And that's a structure that's designed for the sole purpose of taking heavy weight, I wonder how much money went down the drain on that one :o

05omegav6

Will find out when they demolish and rebuild it :D

That said they can use the rubble as hardcore for the new Runway :-X

mka306

Quote from: Taxi Al on 04 June 2015, 07:37:56
Will find out when they demolish and rebuild it :D

That said they can use the rubble as hardcore for the new Runway :-X

;D ;D ;D ;D

Mr Gav

Quote from: Harris K Telemacher on 03 June 2015, 23:28:39
The architect behind the newish carpark at Gatwick North Terminal must be struggling to sleep too... Been open barely five years and already been condemned ::)

The architect will sleep  ok as the structural engineer does all the calculations, if something fails structurally then it's down to him not the architect.

05omegav6

True enough, but the structural engineer is ultimately governed/restricted by the architects pretty pictures... ::)

Sir Tigger KC

Quote from: Harris K Telemacher on 04 June 2015, 09:38:10
True enough, but the structural engineer is ultimately governed/restricted by the architects pretty pictures... ::)

Not really because the structural engineer should be able to go back to the architect and tell him that his pretty pictures don't work in reality.  ::)
RIP Paul 'Luvvie' Lovejoy

Politically homeless ......

Kevin Wood

Quote from: Ex Sir Tigger on 04 June 2015, 10:36:01
Quote from: Harris K Telemacher on 04 June 2015, 09:38:10
True enough, but the structural engineer is ultimately governed/restricted by the architects pretty pictures... ::)

Not really because the structural engineer should be able to go back to the architect and tell him that his pretty pictures don't work in reality.  ::)

Yes, exactly. Ultimate responsibility for the structural integrity of the building rests with the structural engineer. If he's not happy, bricks don't get laid. Of course, it could be that some bright spark of a used car salesman was responsible for turning the first floor into a car park, and he didn't even consider the structural implications. ::)
Tech2 services currently available. See TheBoy's price list: http://theboy.omegaowners.com/

Marks DTM Calib

Structural engineer wont be to concerned, most issues are not in the calcs (which have to be checked and signed off by a third party) but the quality of workmanship.....

Mr Gav

Anything that has structural integrity will have 'to SE specifications' on the drawing so if a contractor wants to use an alternative then it has to be equivalent and approved and that applies to everything like lintels and ties, stud work etc. When it comes to floors and steel then you have to go with what the SE has specified and I can't see any main contractor signing off non spec work. The last job I was on the plasterboard contractor got booted off site for using non approved boards.