vinyl flooring question
« on: 22 March 2016, 19:49:13 »

Hi all a friend has just had a new extension to her kitchen built that has a concrete floor. She has just had a flooring company come out to quote to lay a vinyl floor, the chap states that because it is fresh concrete she will have to wait four months before the vinyl can be laid unless she forks out for an expensive damp proof membrane between the concrete and the vinyl. Any input would be appreciated as four months seem quite a long time to me to allow the floor to dry out  :-\
TIA for any replies
Tony
Logged
Be aware of mole holes be very aware!

hercules

  • Omega Knight
  • *****
  • Offline Offline
  • Gender: Male
  • sunnyudders
  • Posts: 1806
    • View Profile
Re: vinyl flooring question
« Reply #1 on: 22 March 2016, 19:57:19 »

a quick peep on google states if laying on a new concrete floor it can take up to six months to dry out completely  :o
Logged

2boxerdogs

  • Guest
Re: vinyl flooring question
« Reply #2 on: 22 March 2016, 22:30:03 »

Yep, can vouch for this bought a new house in 1979 in South Croydon vinyl floor in kitchen had been laid on concrete which had not dried out, resulting in wet winyl all had to be removed & done correctly.
Logged

Marks DTM Calib

  • Administrator
  • *****
  • Offline Offline
  • Gender: Male
  • West Bridgford
  • Posts: 34016
  • Git!
    • View Profile
Re: vinyl flooring question
« Reply #3 on: 23 March 2016, 09:30:24 »

Yep and a vapour barrier is no good as ......it will never dry out (remains damp under it, all it does is protect the floor a bit!).

Its typically considered to be 1 day for every mm of thickness.

How do I know? I have contractors in putting down 75mm of screed today!
Logged

Tony H

  • Omega Baron
  • *****
  • Offline Offline
  • Gender: Male
  • liverpool
  • Posts: 4940
  • Black Elites are luurvley
    • View Profile
Re: vinyl flooring question
« Reply #4 on: 24 March 2016, 19:56:32 »

Hmmm! taking in to concideration Marks post is the answer to leave the concrete exposed until it is dry? as that will leave the project unfinished for months. Could the answer be to carry on with the kitchen fitting etc. and leave the floor as the last job a few months down the line? :-\
Logged
Be aware of mole holes be very aware!

tunnie

  • Get A Life!!
  • *****
  • Offline Offline
  • Gender: Male
  • Surrey
  • Posts: 37573
    • Zafira Tourer & BMW 435i
    • View Profile
Re: vinyl flooring question
« Reply #5 on: 24 March 2016, 20:21:47 »

Having just had some plastering done, that took a week to dry. So can easily see concrete taking months!
Logged

2boxerdogs

  • Guest
Re: vinyl flooring question
« Reply #6 on: 24 March 2016, 21:41:09 »

Have spoken to my son in law who is a builder, he says they allow a day for each mm of concrete depth, there is a meter that can measure the amount of damp in a new floor.
Logged

Andy H

  • Omega Lord
  • *****
  • Offline Offline
  • Gender: Male
  • Auckland
  • Posts: 5533
    • Mazda MPV
    • View Profile
Re: vinyl flooring question
« Reply #7 on: 24 March 2016, 21:49:58 »

Yep and a vapour barrier is no good as ......it will never dry out (remains damp under it, all it does is protect the floor a bit!).

Its typically considered to be 1 day for every mm of thickness.

How do I know? I have contractors in putting down 75mm of screed today!
I had 75mm of screed laid in my kitchen & extension in December 2014. We needed to use the space so we bought some felt backed carpet and laid that directly on the screed as protection.

After 5 months I believe it was pretty much dry. (but it took me until last month (February 2016) to finally get round to laying 40 square metres of floor tiles ::)
Logged
"Deja Moo - The feeling that you've heard this bull somewhere before."

Andy B

  • Get A Life!!
  • *****
  • Offline Offline
  • Gender: Male
  • Bury Lancs
  • Posts: 39778
    • ML350 TDM SmartRoadster
    • View Profile
Re: vinyl flooring question
« Reply #8 on: 24 March 2016, 22:22:45 »

.....

After 5 months I believe it was pretty much dry. (but it took me until last month (February 2016) to finally get round to laying 40 square metres of floor tiles ::)

You just can't rush a good job!  :y :y :y
Logged

Sir Tigger KC

  • Get A Life!!
  • *****
  • Offline Offline
  • Gender: Male
  • West Dorset
  • Posts: 24774
    • BMW 530d Touring
    • View Profile
Re: vinyl flooring question
« Reply #9 on: 25 March 2016, 11:39:36 »

Can you speed up the drying process with a dehumidifier?  :-\
Logged
RIP Paul 'Luvvie' Lovejoy

Politically homeless ......

Andy H

  • Omega Lord
  • *****
  • Offline Offline
  • Gender: Male
  • Auckland
  • Posts: 5533
    • Mazda MPV
    • View Profile
Re: vinyl flooring question
« Reply #10 on: 25 March 2016, 11:51:58 »

Can you speed up the drying process with a dehumidifier?  :-\
Not really

It takes a long time for the moisture to migrate from the core to the surface. Screed shrinks as it dries, if the surface is drier than the core then it will crack (particularly when it has not reached anywhere like full strength) . Also if you dry the surface quickly then it will never reach full strength and crumbles.
Logged
"Deja Moo - The feeling that you've heard this bull somewhere before."