Hinkley Point
« on: 03 July 2017, 16:48:00 »

EDF have announced today that the cost of building Hinkley point C will be £1.5 billion more than originally forcast and will now cost £19.6 billion.  It will also be delayed by 15 months and they hope to finish the first reactor by the end of 2025.

In 2007 they said we'd be cooking our Christmas dinners in 2017 using electricity from Hinkley Point C!  ;D

Who'd have thunk it?  ::)

http://www.bbc.co.uk/news/business-40479053
Logged
RIP Paul 'Luvvie' Lovejoy

Politically homeless ......

Doctor Gollum

  • Get A Life!!
  • *****
  • Offline Offline
  • Gender: Male
  • In a colds and darks puddleses
  • Posts: 29993
  • If you can't eat them, join them...
    • Feetses.
    • View Profile
Re: Hinkley Point
« Reply #1 on: 03 July 2017, 17:12:34 »

That's what you get for signing a contract in Euros ;D
Logged
Onanists always think outside the box.

STEMO

  • Guest
Re: Hinkley Point
« Reply #2 on: 03 July 2017, 17:59:57 »

EDF will pay the increase though, not us. They'll get it back when they shaft us with our bills when it's built.
Logged

Varche

  • Omega Queen
  • *****
  • Offline Offline
  • Gender: Male
  • middle of Andalucia
  • Posts: 13996
  • What is going to break next?
    • Golf Estate
    • View Profile
Re: Hinkley Point
« Reply #3 on: 03 July 2017, 18:09:29 »

Plenty of time between now and 2025 for

more cost

more time overuns.

wonder if any of us will be alive when it opens? ???
Logged
The biggest joke on mankind is that computers have started asking humans to prove that they aren’t a robot.

Sir Tigger KC

  • Get A Life!!
  • *****
  • Offline Offline
  • Gender: Male
  • West Dorset
  • Posts: 24745
    • BMW 530d Touring
    • View Profile
Re: Hinkley Point
« Reply #4 on: 03 July 2017, 18:20:13 »

EDF will pay the increase though, not us. They'll get it back when they shaft us with our bills when it's built.

As far as I understand it they will charge a fixed price for the electricity, which when Dave & George signed up to it, was about double the going rate.  :-\

It might turn out to be the bargain of the century when it finally starts producing electricity in 2050!  :)
Logged
RIP Paul 'Luvvie' Lovejoy

Politically homeless ......

Rods2

  • Omega Lord
  • *****
  • Offline Offline
  • Gender: Male
  • Sandhurst Berkshire
  • Posts: 7604
    • 1999 3.0 Elite Estate
    • View Profile
Re: Hinkley Point
« Reply #5 on: 03 July 2017, 19:06:16 »

By the time it is completed the rest of the world will be using fusion reactors. :o :o :o

https://www.sciencealert.com/the-uk-has-just-switch-on-its-tokamak-nuclear-fusion-reactor
Logged
US Fracking and Saudi Arabia defending its market share = The good news of an oil glut, lower and lower prices for us and squeaky bum time for Putin!

Sir Tigger KC

  • Get A Life!!
  • *****
  • Offline Offline
  • Gender: Male
  • West Dorset
  • Posts: 24745
    • BMW 530d Touring
    • View Profile
Re: Hinkley Point
« Reply #6 on: 04 July 2017, 12:22:55 »

The government (both national, regional and local) should stop faffing about and give the green light for the Swansea Bay tidal lagoon project!  :y

There are 5 other lagoon projects at Cardiff, Newport, Colwyn Bay, West Cumbria and Bridgwater Bay and all 6 would be cheaper to build, produce more electricity and would be operational for twice as long (with no horrendous decommissioning costs) than Hinkley Point.  :y

Maybe it's all pie in the sky and I wouldn't be surprised if it decided that the birds are more important than keeping the lights on!  ::)  :-\  Interesting concept though and I like it!  :y

http://www.tidallagoonpower.com/
Logged
RIP Paul 'Luvvie' Lovejoy

Politically homeless ......

LC0112G

  • Omega Baron
  • *****
  • Offline Offline
  • 0
  • Posts: 2525
    • View Profile
Re: Hinkley Point
« Reply #7 on: 04 July 2017, 12:56:59 »

The government (both national, regional and local) should stop faffing about and give the green light for the Swansea Bay tidal lagoon project!  :y

There are 5 other lagoon projects at Cardiff, Newport, Colwyn Bay, West Cumbria and Bridgwater Bay and all 6 would be cheaper to build, produce more electricity and would be operational for twice as long (with no horrendous decommissioning costs) than Hinkley Point.  :y

Maybe it's all pie in the sky and I wouldn't be surprised if it decided that the birds are more important than keeping the lights on!  ::)  :-\  Interesting concept though and I like it!  :y

http://www.tidallagoonpower.com/

Problem is, tidal power isn't continuous - you cannot generate much/any power close to high or low tide. All the projects are in the same area (Bristol Channel/Severn Estuary) so they'll all be 'off' at similar times. Therefore you need something to supply a reliable base load otherwise you'll be in trouble when the end of Corrie/Eastenders coincides with low tide.

And even by their own figures, those 6 lagoons together only supply 8% of the UK power which is similar to what a dual reactor nuclear plant like Hinkly Pt will be.

We need to be targeting one third nuclear, one third fossil, and on third renewable for the foreseeable future. That means one new nuke every 10 years as well as things like tidal, not instead of.
Logged

Sir Tigger KC

  • Get A Life!!
  • *****
  • Offline Offline
  • Gender: Male
  • West Dorset
  • Posts: 24745
    • BMW 530d Touring
    • View Profile
Re: Hinkley Point
« Reply #8 on: 04 July 2017, 14:07:17 »

I'm not saying they should build this instead of Hinkley but as well as.  It would provide competition, so when EDF want to raise the price of the electricity from Hinkley.....  ::)

Not all of the proposed tidal lagoons are in the Bristol Channel/Severn Estuary, there's on in Colwyn Bay and another near Workington in Cumbria.  I'd imagine there's further potential in the Scottish lochs and The Wash.  :y

However, I take your point about continuous energy, but I'm not a fan of nuclear.  It's an expensive, dirty way of providing energy and when it all goes wrong....  :(
Logged
RIP Paul 'Luvvie' Lovejoy

Politically homeless ......

scimmy_man

  • Omega Knight
  • *****
  • Offline Offline
  • Gender: Male
  • yorkshire
  • Posts: 1111
    • View Profile
Re: Hinkley Point
« Reply #9 on: 04 July 2017, 17:49:45 »

a few upstream dams in out of the way valleys would stop the flooding downstream, and give a constant 24/7 power supply.
Logged

Mister Rog

  • Omega Baron
  • *****
  • Offline Offline
  • Gender: Male
  • Wales
  • Posts: 2625
    • Volvo XC70 & V70 D3
    • View Profile
Re: Hinkley Point
« Reply #10 on: 04 July 2017, 18:22:29 »


I can't help feeling uncomfortable about something as major as a nuclear power station being controlled by a foreign entity. I get the same feeling about most essential services, a fair bit of our public transport is owned by the German national railways ( DB ). I'm sure it's all fine, but . . . . .  :-\
Logged
“The desire to be a politician should bar you for life from ever becoming one.” Billy Connolly

Rods2

  • Omega Lord
  • *****
  • Offline Offline
  • Gender: Male
  • Sandhurst Berkshire
  • Posts: 7604
    • 1999 3.0 Elite Estate
    • View Profile
Re: Hinkley Point
« Reply #11 on: 04 July 2017, 18:55:27 »

I'm not saying they should build this instead of Hinkley but as well as.  It would provide competition, so when EDF want to raise the price of the electricity from Hinkley.....  ::)

Not all of the proposed tidal lagoons are in the Bristol Channel/Severn Estuary, there's on in Colwyn Bay and another near Workington in Cumbria.  I'd imagine there's further potential in the Scottish lochs and The Wash.  :y

However, I take your point about continuous energy, but I'm not a fan of nuclear.  It's an expensive, dirty way of providing energy and when it all goes wrong....  :(

The electricity from Hinkley point will be cheap in comparison as from what I've read the only was that the tidal schemes will get built is by taking renewals subsidies to whole new levels of absurdity. >:( >:( >:(
Logged
US Fracking and Saudi Arabia defending its market share = The good news of an oil glut, lower and lower prices for us and squeaky bum time for Putin!

Migv6 le Frog Fan

  • Omega Queen
  • *****
  • Offline Offline
  • Gender: Male
  • Webs End.
  • Posts: 12599
  • Nicole's Papa
    • 3.2 Elite. Boxster. C1.
    • View Profile
Re: Hinkley Point
« Reply #12 on: 04 July 2017, 19:04:31 »

Lets get fracking.  :)
Logged
Women are like an AR35. lovely things, but nobody really understands how they work.

Rods2

  • Omega Lord
  • *****
  • Offline Offline
  • Gender: Male
  • Sandhurst Berkshire
  • Posts: 7604
    • 1999 3.0 Elite Estate
    • View Profile
Re: Hinkley Point
« Reply #13 on: 04 July 2017, 19:17:17 »

Logged
US Fracking and Saudi Arabia defending its market share = The good news of an oil glut, lower and lower prices for us and squeaky bum time for Putin!

grifter

  • Senior Member
  • ****
  • Offline Offline
  • Gender: Male
  • Paisley, Scotland
  • Posts: 962
  • Omega Baron
    • Omega 2.6 CD / Elite 3.2
    • View Profile
Re: Hinkley Point
« Reply #14 on: 04 July 2017, 22:33:50 »

EDF have announced today that the cost of building Hinkley point C will be £1.5 billion more than originally forcast and will now cost £19.6 billion.  It will also be delayed by 15 months and they hope to finish the first reactor by the end of 2025.

In 2007 they said we'd be cooking our Christmas dinners in 2017 using electricity from Hinkley Point C!  ;D

Who'd have thunk it?  ::)

http://www.bbc.co.uk/news/business-40479053

And all built using Chinese technology apparently. Seriously why aren't we building these things with our own government taking charge rather than these multiple sub-contractors to companies half way around the world? And why have we waited so long to build new ones?