I conceded and allowed the honourable Laidback top lend a VERy big hand today. We had a considerable wait while the promised engine didn't arrive. hoist ready, us ready. no engine.
Then after an ear bending to matey with said engine, he finally dropped it off.
We chnaged all the cut hoses whilst we had acces to the back, then the entire loom changed over. then a gentle hoist intop the air, push, lower a bit, push a bit more and ....er job done. 20 mins.
Ok, so that is just the engine in, gearbox still to mate up, then ALL the wiring loom to sort and resolder cut wires for the LPG. Then DEFINITELY rocker gaskets and most likely cambelt and water pump as well as a normal service/oil & filters etc.
So, another week yet.
HUGE ta-very-much-like to Dave, who came around in his new toy. I must say that must be bargain of the year. ! VERY cheap facelift + 1 oil cooler = HUGE profit for him. Good business mate.