Bit more progress tonight!
Start off with some stickers i'm sure you'll like... A bit of a thankyou from us for the parts and advice this forum has offered to date,
On with the leg construction...
Pete gets on with cutting some old hydraulic hose to provide some rigidity for some ducting...
Then we realised he didn't have safety goggles on. What to do?
Sorted
So, with the hse within the ducting we started to attach the legs..
This is our secondary washer bottle from a Vectra which came into Petes firestation for cutting up..
This will be fitted inside the elephant and feed water to the trunk...
Time for some sustinance...
And that was it for the evening..
There will be ALOT of progress this weekend including making the head and covering the basic structure in resin.