Had some more time on the car last night. Finished the hydraulic handbrake and bias valve assembly, it just needed.... assembling and the hose making up to bridge the gap between the valve and cylinder. The hose from the master (the brake pedal one) goes into the bias valve then through the handbrake cylinder, then out the back of this assembly to the rear brakes.

I spent the rest of the night (nearly) finishing the central dash, I've made up the phone mount and the wires that'll go to the "aux in" on the stereo. The yellow one from the phone for music/satnav/calls, and the grey wire comes down from the CB so the stereo can be used to overcome the noise of the car (they might not hear me however

). So this is how it'll look with nothing being used.


And with the phone mounted


Last thing to do is to take all the wires concerned with my added bits and pieces and put them through a giant multiplug connector thing to make taking the dash apart easy in future. Next on the list is another solerthon!
The thought has crossed my mind that I'm spending lots of attention and time getting the dash looking good (well I like the results so far), but the whole car might not work if I haven't got the front suspension wishbones right!!
Time will tell,
More to come