Its getting less and less, but for every two things on the list that I complete another one appears.
The list of things to do before its on the road is as follows (in its entirety):
Paint the bonnet and fit it (easy, but paint hasn't arrived)
Put convex glass in one of the side mirrors (easy but haven't got the glass yet)
Finish the doors, cut the polycarb to shape and make a raising mechanism (not easy, still requires a little thinking)
Make some kind of a draft excluder around the door hinge area (not to hard, not sure how yet though)
Fit doors (easy)
Fit new Gaz shock (easy)
Set camber and tracking (need to borrow the tools)
Crimp ends of the LPG line and fit gas hoses (not too bad, need to borrow the tool)
and finally fit the propshaft (easy)
Its a little longer than I thought, but its not far off compared to this time 2 years ago

There is another list of things before I want to take it on a track day though. I'l hopefully be starting the window mechanism on Sunday if the polycarb arrives
More to come