Cheers for the comments guys!

I don't think I would have been too impressed if my brickies had thrown this up in 2 days!

It took more like 9 days in total with 2 of them, but there worked to a pre-agreed price that I was happy with.

So on with the update...
On Saturday it was time to finally pour the concrete floor of 'OmeGarage' (thanks Paul!

). It was always going to be a manic day, so I apologise for not getting as many pictures as I would have liked. I gave the job of official photographer to SWMBO, but apparently she was too busy making coffee and bacon sandwitches!

As well as pouring the floor, I also wanted to pour 2 of the 3 three bays behind the garage. This totalled 16m3 of concrete, which works out at about 38 tonne, or 380 wheelbarrow loads!

Needless to say, I called on the services of many very generous friends to help on the day. I shall be repaying these favours for some considerable time I suspect!

Everyone arrived between 7 and 8am, and we completed laying the steel mesh on chairs, and tying everything together. At 9am, I had to squeeze this down my drive! The first of 2...


This truck holds 8m3 of concrete, so the plan was to get that all in the garage, then for it to reload and return with another 8m3 to finish the garage and then do the 2 bays.
So where are a couple of pics showing the the concrete going down in the garage...



Man I got sick of the sight of this...


Coming along nicely...



So then it was time to crack on with the bays...





For those of you who don't know, this is me...

These last shots show the powerfloating of the floor going on, which went on way into the night. We finished at about midnight, so a very long day!!




Hope you like...